The Pneumatic Tube Station (PTS) Bay provides an area for dispatching and receiving of items via the pneumatic tube system.
Where a Bay - Pathology (POCT) exists, it will ideally be collocated. Bay to be located in a staff accessible area under staff supervision.
Amendment
02.07.2019 First Draft
Fabric and outline specifications
ID
Fabric
Material
Finish
Specification
Selection
Remarks
3000
Wall finish
Paint
Acrylic, washable
5010
Ceiling
Plasterboard
Paint, washable
Flush set, suspended
or consistent with adjacent area
4031
Wall protection
Composite
Prefinished PVC
Corner guards to 1500mm AFFL
other heights also acceptable as per project standardisation