1 Bed Room - Standard, 18m2, Outboard Ensuite

Room Code PABX-I
Net Room Area Briefed 14
Hours of Operation 24 Hours
Occupancy 1 - 2 intermittently
Description / Special Requirements A secure room for the PABX mainframe modules. Room temperature should be maintained for heat generating equipment.
Amendment 24.10.10, - First Draft

Fabric and outline specifications

ID Fabric Material Finish Specification Selection Remarks
1000 Floor finish Vinyl Standard slip resistant Seamless, coved
2000 Skirting Vinyl Prefinished Floor vinyl coved, 150mmH
3000 Wall finish Paint Acrylic, washable
9110 Doors Solid Core Paint 1 1/2 leaf 1400mm clear opening, lockable
6025 Cornice Aluminium Powdercoat shadow line
8040 Door protection Composite Prefinished PVC To door frame
8010 Door protection Composite Prefinished PVC Protection plate to 900AFFL
5030 Ceiling Plasterboard Prefinished Drop-in tiles, 600x1200 mm

Fittings and Furniture (FF)

ID Description Category Group Qty Selection / Remarks

Fixtures, Equipment and associated Services (FE)

ID Description Grp Qty Ele Data CdW HtW WmW Tap Dns Gas Selection / Remarks
38450 PABX 1 1 yes yes ___ ___ ___ ___ ___ ___ mainframe, as specified by engineers

Services

ID Description Service Category Qty Selection / Remarks
1006 Voice / Data outlet: double Communications 1 1 outlet for telephone
5000 Airconditioning HVAC maintain temperature for heat generating equipment
2189 General LED Lighting
2577 PO: Double Power 2
9020 UPS (uninterruptible power) Power may be required
2587 PO: Special: for equipment Power to each module