The Scrub-up/ Gowning 6m2 provides for pre-operative scrubbing and gowning/ gloving, located adjacent to a Procedures Room or Imaging Room.
Additional Design Considerations:
- A minimum of 800mm is required between scrub stations
- Taps to be non touch - automatically operated or foot operated
Amendment
03.09.2023 RDS updated
Fabric and outline specifications
ID
Fabric
Material
Finish
Specification
Selection
Remarks
1000
Floor finish
Vinyl
Standard slip resistant
Seamless, coved
1020
Floor finish
Vinyl, non-slip
Safety
Seamless, coved
to wet zone
2000
Skirting
Vinyl
Prefinished
Floor vinyl coved, 150mmH
4031
Wall protection
Composite
Prefinished PVC
Corner guards to 1500mm AFFL
other heights also acceptable as per project standardisation
3052
Wall finish
Vinyl
Prefinished
Wall vinyl to 1500mm AFFL
3010
Wall finish
Paint
Scrub resistant
5020
Ceiling
Plasterboard
Paint, scrub resistant
Flush set, suspended
2767
Cornice
Plasterboard
Paint
Square set
Fittings and Furniture (FF)
ID
Description
Category
Group
Qty
Selection / Remarks
6158
Dispenser: soap antiseptic
Furniture/ Fitting
2
Qty (2), part of scrub sink
6164
Dispenser: scrub brush
Furniture/ Fitting
2
Qty (2), part of scrub sink
8622
Trolley: gowns
MEQ - Furniture
3
1
optional
8594
Linen carrier: dirty, single
MEQ - Furniture
3
1
19810
Shelf: SS, over
Metalwork
1
1
over scrub trough
Fixtures, Equipment and associated Services (FE)
ID
Description
Grp
Qty
Ele
Data
CdW
HtW
WmW
Tap
Dns
Gas
Selection / Remarks
10132
Clock: master clock
1
1
yes
opt
___
___
___
___
___
___
10335
Tapware: scrub, sensor
1
yes
___
yes
yes
yes
___
___
___
Qty (2), part of scrub sink; auto/ knee operated taps also acceptable