Edit it in Health Facility Briefing System (HFBS) | |||
---|---|---|---|
Edit this room data or print a PDF using the HFBS - Health Facility Briefing System. Customise this room data for your project, or add it to an existing health facility brief in HFBS Briefing Module. | Edit Briefing |
Room Layout Sheet | |||
---|---|---|---|
Download a PDF Room Layout Sheet (RLS) for this standard component. | Free | View |
Other Files | |||
---|---|---|---|
Buy an edible AutoCAD DWG Room Layout Sheet (RLS) for this standard component. | $2.99 |
Online Room Data Sheet |
---|
Room Code | ECL-12-I |
Net Room Area Briefed | 12 |
Hours of Operation | 24 Hours |
Occupancy | 1 - 2 |
Description / Special Requirements | The Equipment Clean-Up Room is used for cleaning and maintaining of equipment used in the Unit. Storage may be required for holding cleaned equipment and spares. Equipment may also be recharged in this room. Natural light is desirable. |
Amendment | 24.10.2010 First Draft 02.05.2011 FE and Services updated |
ID | Fabric | Material | Finish | Specification | Selection | Remarks |
1020 | Floor finish | Vinyl, non-slip | Safety | Seamless, coved | ||
2000 | Skirting | Vinyl | Prefinished | Floor vinyl coved, 150mmH | ||
5021 | Ceiling | Plasterboard | Paint, washable | Water resistant, flush set, suspended | ||
9004 | Doors | Solid Core/ Glass | Paint | Single leaf, observation panel | 1100mm clear opening, lockable | |
6025 | Cornice | Aluminium | Powdercoat | shadow line | ||
8010 | Door protection | Composite | Prefinished PVC | Protection plate to 900AFFL | ||
8040 | Door protection | Composite | Prefinished PVC | To door frame | ||
3000 | Wall finish | Paint | Acrylic, washable | |||
3052 | Wall finish | Vinyl | Prefinished | Wall vinyl to 1500mm AFFL |
ID | Description | Category | Group | Qty | Selection / Remarks |
1010 | Bench: stainless steel | Metalwork | 1 | 1 | with wet edge, inset sinks |
4360 | Cupboard: door ht adj. shelves | Furniture/ Fitting | 3 | 2 | optional |
6152 | Dispenser: disposable glove | Furniture/ Fitting | 2 | 1 | |
6154 | Dispenser: paper/ hand towel | Furniture/ Fitting | 2 | 1 | to basin |
6156 | Dispenser: soap | Furniture/ Fitting | 2 | 1 | to basin |
6158 | Dispenser: soap antiseptic | Furniture/ Fitting | 2 | 1 | to basin |
19820 | Shelf: SS, under | Metalwork | 1 | 1 | under bench |
20000 | Shelving unit: adjustable | Furniture/ Fitting | 1 | 1 | over bench |
23950 | Trolley | Furniture/ Fitting | 3 | 3 | optional |
24100 | Waste bin: paper, 20 Litre | Furniture/ Fitting | 3 | 1 | to basin |
ID | Description | Grp | Qty | Ele | Data | CdW | HtW | WmW | Tap | Dns | Gas | Selection / Remarks |
2800 | Basin: handwash, Type B | 1 | 1 | ___ | ___ | yes | ___ | yes | yes | yes | ___ | |
45601 | Hose: spray | 1 | 1 | ___ | ___ | yes | yes | ___ | ___ | ___ | optional | |
49005 | Sink: 500x450x300D | 1 | 2 | ___ | ___ | yes | opt | opt | yes | yes | ___ | provide hot water; confirm sink dimensions |
58200 | Washer sanitiser: utensil | 1 | 1 | yes | ___ | yes | yes | ___ | yes | yes | ___ | optional |
ID | Description | Service Category | Qty | Selection / Remarks |
4000 | Hot water: outlet | Hydraulics | 1 | if utensil washer provided |
4010 | Cold water: outlet | Hydraulics | 1 | |
4033 | Floor waste | Hydraulics | 1 | if utensil washer provided |
5015 | Ventilation | HVAC | ||
5019 | Exhaust | HVAC | ||
2189 | General LED | Lighting | ||
2577 | PO: Double | Power | 2 | |
2587 | PO: Special: for equipment | Power | 1 | if utensil washer provided |